Opening a Corrective Work Order from a Maintenance Task (Web & Mobile)

Andrea
Andrea
  • Updated

When a building engineer finds a problem while working a maintenance task, they can open a corrective work order directly from that task instead of logging a separate ticket from scratch. The work order stays linked back to the task and equipment it came from, so the history travels with it.

Before you start: The work order type, default priority/category, and which roles can create a corrective work order from a task are controlled by your Work Order Setup & Configuration settings. If those defaults need to change, start there rather than here.

On the Web Dashboard

  1. Open the maintenance task from the dashboard
  2. Under Overview, select Corrective Work Order on the task. Screenshot 2026-10-21 at 10.18.12 AM.png
  3. The Corrective Work Order drawer opens on the right-hand side, which carries over the equipment, location (building, floor, suite), and a reference in the description to the PM task — and fill in anything that doesn’t, such as assignee.Screenshot 2026-10-21 at 10.18.59 AM.png
  4. Add the problem details: describe what you found, and attach photos or notes if useful.
  5. Submit the work order.

On the Mobile App

  1. Open the maintenance task from your task list.
  2. Tap Open Corrective Work Order
  3. Select the type of service request
  4. The location( building, floor, suite) and equipment will carry over
  5. Add the problem details, including photos if useful.
  6. Submit the work order.

 